location redirect
This is a demo of a seamless insert of an Icecat LIVE product data-sheet in your website. Imagine that this responsive data-sheet is included in the product page of your webshop. How to integrate Icecat LIVE JavaScript.
full icecat

Microsoft Project 2013, 1u, SLNG, OVL-C Project management Microsoft Volume License (MVL) 1 license(s)

Brand:
The general trademark of a manufacturer by which the consumer knows its products. A manufacturer can have multiple brand names. Some manufacturers license their brand names to other producers.
Microsoft Check ‘Microsoft’ global rank
Product name:
Product name is a brand's identification of a product, often a model name, but not totally unique as it can include some product variants. Product name is a key part of the Icecat product title on a product data-sheet.
Project 2013, 1u, SLNG, OVL-C
Product code:
The brand's unique identifier for a product. Multiple product codes can be mapped to one mother product data-sheet if the specifications are identical. We map away wrong codes or sometimes logistic variants.
076-05333
Icecat Product ID:
The Icecat Product ID is the unique Icecat number identifying a product in Icecat. This number is used to retrieve or push data regarding a product's datasheet. Click the number to copy the link.
Data-sheet quality: created/standardized by Icecat
The quality of the product data-sheet can be on several levels:
only logistic data imported: we have only basic data imported from a supplier, a data-sheet is not yet created by an editor.
created by Microsoft: a data-sheet is imported from an official source from a manufacturer. But the data-sheet is not yet standardized by an Icecat editor.
created/standardized by Icecat: the data-sheet is created or standardized by an Icecat editor.
Product views: 28209
This statistic is based on the 97136 using ecommerce sites (eshops, distributors, comparison sites, ecommerce ASPs, purchase systems, etc) downloading this Icecat data-sheet. Only sponsoring brands are included in the free Open Icecat content distribution as used by 94642 free Open Icecat users.
Info modified on: 14 Mar 2024 18:46:15
The date of the most recent change of this product data-sheet in Icecat.
Bullet Points Microsoft Project 2013, 1u, SLNG, OVL-C Project management Microsoft Volume License (MVL) 1 license(s)
Each of several items in a list, preceded by a bullet symbol for emphasis. For easy access to this data, refer to the "BulletPoints" tag in XML or JSON.
:
  • - Project management
  • - License type: Microsoft Volume License (MVL)
  • - 1 license(s)
Long product name Microsoft Project 2013, 1u, SLNG, OVL-C Project management Microsoft Volume License (MVL) 1 license(s) :
The long product name of Microsoft Project 2013, 1u, SLNG, OVL-C Project management Microsoft Volume License (MVL) 1 license(s). For easy access to this data, refer to the "ProductDescription" block and the "ShortDesc" tag in XML or the "Description" block and the "LongProductName" tag in JSON.

Project 2013, 1 user, Single language, Open Volume - Level C
More>>>
Short summary description Microsoft Project 2013, 1u, SLNG, OVL-C Project management Microsoft Volume License (MVL) 1 license(s):
This short summary of the Microsoft Project 2013, 1u, SLNG, OVL-C Project management Microsoft Volume License (MVL) 1 license(s) data-sheet is auto-generated and uses the product title and the first six key specs.

Microsoft Project 2013, 1u, SLNG, OVL-C, Project management, Microsoft Volume License (MVL), 1 license(s), Windows Server 2008 R2 Windows Server 2012 Windows 7 Windows 8, 1 GHz, 1024 MB

Long summary description Microsoft Project 2013, 1u, SLNG, OVL-C Project management Microsoft Volume License (MVL) 1 license(s):
This is an auto-generated long summary of Microsoft Project 2013, 1u, SLNG, OVL-C Project management Microsoft Volume License (MVL) 1 license(s) based on the first three specs of the first five spec groups.

Microsoft Project 2013, 1u, SLNG, OVL-C. Type: Project management, License type: Microsoft Volume License (MVL), License quantity: 1 license(s). Compatible operating systems: Windows Server 2008 R2 Windows Server 2012 Windows 7 Windows 8, Minimum processor: 1 GHz, Minimum RAM: 1024 MB. Platform: Win

Country Distributor
United Kingdom 1 distributor(s)